Packaging engineering for food, pharma, pet care and consumer goods

EXPORT, PACKING & LOGISTICS

The machine is half the project. Getting it there intact is the other half.

Delivery terms, crate specification, dimensions and weights, documentation and installation readiness decide whether a project lands on schedule. Publishing them removes an entire round of email from every enquiry — and removes the suspicion that the supplier has not shipped internationally before.

ILLUSTRATIVE — replace all dimensions, weights, lead times and terms with verified project data.

DELIVERY TERMS

Which Incoterms we quote, and what each side carries

Quoting a price without stating the term is meaningless. These are the terms normally used for packaging machinery.

TermSeller carriesBuyer carriesTypical use
EXWMachine available at the plant, export packing on requestAll transport, export clearance, freight, insurance, duty, import clearanceBuyer has an established freight forwarder
FOB (named port)Export packing, inland haulage, export clearance, loading on vesselOcean freight, insurance, duty, import clearance, delivery to siteMost common for full container shipments
CIF (named port)The above plus ocean freight and minimum insurance to destination portDuty, import clearance, port charges, delivery to siteBuyer wants a single freight figure in the quotation
DAP (site)Everything to the named site except import duty and taxesImport duty and taxes, unloading, installation readinessTurnkey projects where the buyer wants one responsible party
DDPEverything including import duty and taxesUnloading and installation readiness onlyQuoted case by case — depends on the destination tax regime
DEMO NOTE — a real supplier should state which terms it will and will not quote. Offering DDP into a market where you have no fiscal representation creates a problem you cannot solve later.
EXPORT PACKING

Specify the crate, not just the machine

Machinery damage in transit is almost always a packing decision made months earlier.

01

Fumigation-compliant timber

Heat-treated wood marked to ISPM 15, so the crate is not held or destroyed at the destination port.

02

Moisture protection

Sealed barrier film with desiccant sized to voyage duration and route. Specified per destination climate, not by default.

03

Internal bracing

Servo axes, film carriage and weigher locked for transit, with a removal checklist attached to the machine, not buried in the manual.

04

Shock and tilt indicators

Applied to the crate so damage claims can be evidenced at unloading rather than argued about weeks later.

05

Spares in a separate crate

Commissioning spares and tooling packed separately and labelled, so they are not lost inside the machine crate.

06

Marking and packing list

Crate marking, gross and net weight, centre of gravity, lifting points and a packing list matching the commercial invoice.

SHIPPING DATA BUYERS NEED EARLY

Publish this per model, not on request

A plant engineer cannot plan an installation without these numbers, and a forwarder cannot quote without them.

Data pointWhy it is neededWhere it belongs
Crated dimensions (L × W × H)Container selection and door clearance at siteProduct page specification block
Gross and net weightCrane or forklift capacity, floor loadingProduct page specification block
Container fitWhether the machine ships in 20ft, 40ft or requires flat rackProduct page specification block
Number of cratesReceiving and storage planningQuotation and packing list
Installation footprint and service clearancePlant layout before the machine arrivesProduct page + layout drawing
Utility requirementsElectrical supply, compressed air quality and flow, extractionProduct page specification block
Estimated lead timeProject scheduling and budget approval timingQuotation, stated as a range with the conditions
AFTER ARRIVAL

Installation readiness and parts logistics

The two questions that decide whether the machine produces on schedule.

Site readiness checklist

  • Floor prepared, level and load-rated for the machine
  • Electrical supply terminated at the stated voltage and phase
  • Compressed air at the stated pressure, flow and dryness class
  • Extraction or dust handling where required
  • Unloading equipment and access route confirmed
  • Operators and maintenance staff scheduled for training
  • Production film and product available for ramp-up

Spare-parts logistics

Commissioning spares ship with the machine. Recommended stock lists are split into two tiers: critical spares to hold on site, and planned-replacement items to order against a maintenance schedule.

For destinations where air freight of a small part still takes days, the practical answer is a correctly sized on-site kit, not a promise of fast shipping. Ask any supplier which tier they recommend and why.

COMMON QUESTIONS

Questions buyers ask before a technical discussion

If you have an established forwarder and import process, FOB usually gives the best control and cost visibility. If you want a single figure and a single responsible party, CIF or DAP is simpler. DDP shifts tax handling to the seller and is not always available.

Build time and transit time are separate figures and should be quoted separately. Ask for both, plus the conditions that would change them — typically component lead times and the date the FAT protocol is agreed.

It follows the Incoterm and the insurance arrangement. This is why shock and tilt indicators matter: they let damage be identified and evidenced at unloading, before the crate is opened and responsibility becomes arguable.

Yes, but sequence it deliberately. Receiving downstream equipment before the primary packaging machine usually creates storage problems. The delivery sequence should be part of the line layout discussion, not an afterthought.

START WITH THE APPLICATION

Send the destination and site conditions with the enquiry

Country, port or site address, available utilities and access constraints. It lets the first quotation include realistic freight and installation assumptions instead of placeholders.